Understand the work
See what’s included, what’s left out, and where the scope needs a clearer explanation.
Your renovation ally
Have a renovation quote in hand? See what’s included, what could change the cost, and what to ask your contractor before you decide.
$79 once. No subscription.
Analyze one quote or compare up to three.
Your documents and report are private. How we handle your documents.

Example Project Workspace · Fictional project
Harbor’s quote includes a plumbing allowance that assumes access from the basement. Elsewhere, it says the half-bath plumbing route hasn’t been verified from below.
There’s a price in the budget, but an assumption behind it is still unresolved. If the route changes, the work and price could change with it.
Could we confirm the plumbing route at the walk-through, then update the scope and price if needed?
Plumbing Rough-In Allowance · $6,000
“Budget placeholder for kitchen reconnects and half bath routing. Assumes accessible basement below.”
Project assumptions
“Half bath plumbing route has not been verified from below.”
Source: Harbor’s fictional preliminary budget. This is a question to resolve, not a finding that the route is unworkable.
$3,600 is for flooring materials. Installation is a separate $8,750 line.
$5,000 covers materials and basic installation together.
Comparing the two allowance amounts would miss Northline’s separate labor cost. Match the flooring, area, and preparation before comparing these prices.
Could you price the same flooring and area, with separate amounts for materials, installation, and floor preparation?
Northline lists approximately 720 square feet. Harbor says its flooring quantity is approximate, so the areas also need to be matched.
Northline excludes floor preparation beyond standard scraping. Harbor excludes major subfloor repair. The documents do not establish an identical preparation scope.
Sources: fictional Northline proposal, pricing and exclusions; fictional Harbor budget, pricing, assumptions, and exclusions.
From quote to conversation
Start with one quote, or add up to three to compare.
See what’s included, what could change the cost, and what still needs clarification.
Work through the details with included AI discussion before your next contractor conversation.
Start with the few things that matter. Open the supporting detail when you need it.
See what’s included, what’s left out, and where the scope needs a clearer explanation.
Understand allowances, upgrades, and extra work. Ask for prices before making your choices.
Clarify who chooses materials, arranges permits, and approves changes. Know when you need to act.
Get practical questions for your contractor. Talk through the answers in your workspace and decide what to clarify next.
Understand the details before your next contractor conversation.